Orta (Çankırı) Potable Water Supply Project
ORTA (CANKIRI) POTABLE WATER SUPPLY PROJECT
PROJECT TYPE
EPCM, Fixed Price
SERVICES PROVIDED
- Design and Planning
- Construction Supervision and Quality Control
- Construction and Project Management
- Feasibility Studies
- Technical Specification
- Geotechnical Engineering
- Environmental Assessment and Hydrological Studies
- Urban Development
- Administrative Support and Approvals
- Cost Management
- Risk Management
- System Certifications
BACKGROUND
The tendering authority for all of our infrastructure projects is T.C.İller Bankası. T.C. İller Bankası is the governmental institu¬tion who provides the funding, tendering and supervision of most of the municipal infrastructure projects. These projects were constructed by PROCCEA under contract with T.C.İller Bankası.
PROJECT DESCRIPTION
The potable water supply projects consist of water transport, storage, pumping stations and network components. A mix of pvc, steel and asbestos-cement pipes were used.
-
20km. water supply network (100-300mm radius)
-
10km. water transport Line (200mm radius]
-
500m3 underground water resorvoir
-
Pumping stations,
STATUS |
CONTRACTED AS |
CLIENT |
COMPLETION |
Completed |
EPCM,Prime Contractor |
T.C. İller Bankası |
1997 |
DESIGN PERIOD |
CONSTRUCTION PERIOD |
||
30 days |
180 days |