Aliaga (İzmir) Waste Water Network Project
ALIAGA (IZMIR) WASTE WATER NETWORK PROJECT
PROJECT TYPE
EPCM, Fixed Price
SERVICES PROVIDED
- Design and Planning
- Construction Supervision and Quality Control
- Construction and Project Management
- Feasibility Studies
- Technical Specification
- Geotechnical Engineering
- Environmental Assessment and Hydrological Studies
- Urban Development
- Administrative Support and Approvals
- Cost Management
- Risk Management
- System Certifications
BACKGROUND
The tendering authority for all of our infrastructure projects is T.C.İller Bankası. T.C. İller Bankası is the governmental institution who provides the funding, tendering and supervision of most of the municipal infrastructure projects. These projects were constructed by a sister company of PROCCEA under contract with T.C.İller Bankası.
PROJECT DESCRIPTION
The waste water projects consist of main collector line, elevation lines, elevation centers, pumping stations, network and treat¬ment plant components. A mix of steam-cured concrete and fibreous glass reinforced plastic pipes were used.
- 80km.Waste water network (200-300mm radius),
- Elevation Centers
STATUS |
CONTRACTED AS |
CLIENT |
COMPLETION |
Completed |
EPCM, Prime Contractor |
T.C. İller Bankası |
2008 |
DESIGN PERIOD |
CONSTRUCTION PERIOD |
||
90 days |
36 months |