Demir Export Bakırtepe Gold Mine
DEMIR EXPORT BAKIRTEPE GOLD MINE, SIVAS, TURKEY
PROJECT TYPE
Contractor to Demir Export
SERVICES PROVIDED
- Civil Design
- Structural Steel Design, Manufacturing & Installation
- CIC Columns Design, Manufacturing & Installation
- ADR Plant Design & Equipment Provision Installation, Start-up and Staff Training
- Laboratory Design, Installation, Equipment Provision and Start – up
- Electric Design and Equipment Supply
- Reagent Storage Design and Construction
- Heap Leach and Ponds Pump Station Design, Installation and Start - up
- Qualitiy Documentation
- Automation
BACKGROUND
Sivas Bakırtepe gold deposit is located in 81,5 Km southeast of Sivas City, 24 km east of Kangal District, 7 Km southeast of Cetinkaya Town. The Mine license were taken from the General Directorate of Mining Affairs' tender in 2006. Gold potential was discovered with prospecting, exploration and drilling. Environmental baseline studies have started within the scope of environmental impact assessment. In addition, design and engineering studies of ore processing (leach pad) and mining have started.
BENEFITS TO CUSTOMER
- On Schedule Manufacturing, Delivery, Installation and Start-up
- High Quality Goods and Latest Technology
PROJECT DESCRIPTION
Demir Export Bakırtepe Gold Mine is heap leach operation with 2 ton CIC carbon process capacity and 1 ton stripping procecs capacity ADR plant designed by CH and provision and installation by CH Engineering. In the scope of project, we will have done reagent, CIC, ADR equipment provision, structure steel manufacturing and installation, FRP and Steel Tanks manufacturing and installation, Complete gold room system installation, electric woks, automation system and start up with staff training.
STATUS |
CONTRACTED AS |
CLIENT |
COMPLETION |
On going |
Contractor |
Demir Export |
2013 |
DESIGN PERIOD |
CONSTRUCTION PERIOD |
|
|
120 days |
180 days |