Amesmessa-Trek Gold Mine
AMESMESSA-TREK GOLD MINE, ALGERIA
ENOR SPA (GMA RESOURCES) ADR PLANT
PROJECT TYPE
Prime Contractor
SERVICES PROVIDED
- Structural Steel Design & Manufacturing
- CIC Columns Design & Manufacturing
- ADR Plant Installation
- Start-up & Commissioning
- Staff Training
BACKGROUND
The Amesmesa gold deposid is located 12 km North – South of Ouzzal. The Amesmessa mine is currently in production Approximately 3.7 tons of gold were produced by the Heap Leach. Also the The Tirek gold deposit is located at about 64 km north of the Amesmessa mine. Algeria Power and Resources Minister attended the first Gold pour at the plant.
BENEFITS TO CUSTOMER
- Local Staff Training
- Fast Installation and Start-up Under Hard Conditions
- Tips for the Maintenance of Equipment for Longer Life
PROJECT DESCRIPTION
Amesmesa – Tirek gold mine use both CIC and CIL system and it has 4 tons ADT plant. CH Site Team supplied professionally all required installation ADR and CIC tools. All plant was erected, commissioned and started up in 4 months under hard conditions. CH site team had completed 160 Tons of Structural Steel Erection, 5 Steel Tank Installation, Over 5000 meters of CS and UPVC piping, 87 Equipment Installation & Start up
STATUS Completed |
CONTRACTED AS Prime Contractor
|
CLIENT Enor Spa
|
COMPLETION 2007
|
DESIGN PERIOD |
CONSTRUCTION PERIOD |
||
30 days
|